Skip Navigation Links
Home
Downloads
About
       

Program Setup

Shift Production Parameters

Define Line Areas

Define Storage Locations

Finished Goods Definitions

Raw Material Definitions

Bin To Bin Transfers

Raw Material Receiving

P. O. Receipts

Remote Receiving

Update Remote Scanner

Enter Production Data

Down Grade or Rejecting

Edit Lot Id. Data

Export Production

Production Viewer

Raw Material Usage

Set Label Printer

View Pending Export

QC Validation Setup

Reel Data

Entering Saturated Felt or Shingle Production

Navigation


You will be presented with the following screen. 

Click New to begin a production run you will then be presented with the display below.

 

Verify Today’s Production Date, enter Production ID, Shift, Line Code (SF = Saturated Felt, RL = Roofing Line), and then enter the Item Code you are making and the Base Material you are using.  The Production ID should change each time a shift or product is changed.  Click OK when complete.


If the production and shift data are acceptable click OK to begin scanning raw material rolls.



The green plus button will now be active.  To add a roll of raw material, click the green button to scan the roll. 

 

As each roll is scanned you will see it populated in the Raw Material Lot ID section.


When the run is complete, enter the completed quantities of the production run.  For Saturated Felt the number of firsts and seconds should be in rolls, and for Shingles the production numbers should be in bundles.  Enter the run time and down time minutes and click OK.

 

At the end of every shift, the shift supervisor or superintendent is responsible for verifying the production and exporting the data to PeopleSoft.  See Export Production

 

 